P4078¶
- Code
P4078
- Message
Task INTERVAL is negative
This error occurs when a TASK declares a negative INTERVAL. The
interval of a cyclic task is the time between the starts of two runs, so it
cannot be less than zero.
Example¶
The following code will generate error P4078:
CONFIGURATION config
RESOURCE resource1 ON PLC
TASK task1(INTERVAL := T#-10ms, PRIORITY := 1);
PROGRAM instance1 WITH task1 : main;
END_RESOURCE
END_CONFIGURATION
To fix this error, give the task a positive interval:
CONFIGURATION config
RESOURCE resource1 ON PLC
TASK task1(INTERVAL := T#10ms, PRIORITY := 1);
PROGRAM instance1 WITH task1 : main;
END_RESOURCE
END_CONFIGURATION
A task with an interval of zero, or with no INTERVAL, runs freewheeling:
the runtime starts the next scan cycle as soon as the previous one finishes.
Think IronPLC is wrong about this?
If you believe this diagnostic is incorrect, open an issue on GitHub with a small sample that demonstrates the problem.